TLE Aquaculture 7/8 Quarter 1 Module 4: Draw and Layout Ponds

Grade 7/8 TLE Aquaculture Quarter 1 Module 4 teaches fishpond units, scaling procedures, and how to draw freshwater and brackish water pond layouts.

This self-learning module is Quarter 1, Module 4 of the Technology and Livelihood Education (TLE) Aquaculture Exploratory Course for Grades 7 and 8. It was published by DepEd SOCCSKSARGEN Region as a First Edition in 2020. It teaches learners the knowledge and skills needed to draw a layout plan for ponds. By the end, learners can name the compartments of a fishpond, scale real measurements onto paper, and draw different pond designs.

On this page 8 sections

What learners will learn

After going through this module, learners are expected to:

  1. identify the different pond compartments;
  2. determine scaling procedures; and
  3. draw the layout of different pond designs according to established procedures.

Fishpond layout and common units

The module defines a fishpond as an artificial body of water surrounded by dikes, with accessories such as gates, pipes, and canals for managing the water supply. Fishpond designs should be simple and functional. The style of the compartments depends on the nature and quality of the water supply and on the species of fish to be raised.

These are the common units of a fishpond that the module lists:

UnitPurpose
Nursery pond (NP)Rearing fish fry to fingerling size
Transition pond (TP)Storing or acclimatizing fingerlings. It sits next to the nursery pond, with a slightly lower bottom.
Rearing pond (RP)Raising fingerlings to marketable size. It is the largest compartment, also called the grow-out pond.
Breeding pondConfining breeders
Hatching pondHolding eggs until they hatch
Catching pond (CP)Confining and catching fry, fingerlings, and marketable fish. It is built at the gate inside the pond it serves.
Head pondStoring reserve water
Feed pondProducing natural food such as lab-lab, lumut, or plankton
Water supply canalSupplying water to the different compartments

Scaling procedure

A scale is the relationship between a real object and the feature that represents it on a map. A scale can be reduced or enlarged by a certain amount. Examples are 1:10 m, 1:100 m, and 1:1000 m.

The module solves this problem with a proportion. If 1 cm on a map stands for 25 km, then 2.7 cm stands for 25 x 2.7 = 67.5 km.

Types of improved freshwater fishpond layouts

  1. Conventional: one sluice gate and a long water supply canal that feeds the compartments.
  2. Radiating: one sluice gate, a wide and short supply canal, and secondary gates in the different compartments.
  3. Progressive: one sluice gate, a long supply canal, and secondary gates to compartments of progressively increasing size.
  4. Specialized: one sluice gate, one or two drainage gates, secondary gates, and a large supply and catching canal or pond.

The module gives six advantages of these improved layouts:

  • easy control of pond water
  • easy removal of fish pests and predators
  • easy cropping
  • pond bottom cultivation whenever needed
  • easy artificial feeding once natural food runs out
  • high productivity

Layout specifications for brackish water fishponds

Three systems are described. The percentages are shares of the total production area (TPA).

  • Conventional pond system: the NP is about 1%, the TP about 9%, and the RP about 80% of the TPA. A catching pond for an NP or TP should be at least 2% of that compartment’s watered area, and 1 to 1.5% if it serves an RP.
  • Modular pond system: the NP is about 4% and the TP 6% of the TPA. The RP is divided into three Production Process Stages (PPS), and fingerlings move to the next larger module as they grow.
  • Multiple stock/harvest system: at least two NPs make up 6% of the TPA. Each RP has its own fish holding canal (FHC) of at least 1% of its area, which holds fingerlings while the rearing ponds are prepared. RPs, including FHCs, cover up to 94% of the TPA. Fingerlings of different sizes are stocked at different times, and the bigger fish are harvested selectively with a gill net.

The module works out a one-hectare (10,000 m2) conventional layout:

  • NP = 10,000 x 0.01 = 100 m2
  • RP = 10,000 x 0.80 = 8,000 m2
  • CP = 100 x 0.02 = 2 m2

A fishpond system also needs water control facilities to regulate the flow of water. These include dikes and gates, plus support structures such as supply and drainage canals, flumes, pumps, and aerators.

How to use this module

The module follows the usual parts of a DepEd self-learning module:

  • What I Know: a 10-item multiple-choice pretest.
  • What’s In: a review of the previous lesson on fish weight, liming, and feed formulation.
  • What’s New and What is It: the lesson itself.
  • What’s More and What I Have Learned: short written tasks.
  • What I Can Do: a performance task.
  • Assessment: the post-test.
  • Additional Activities: labeling a pond and its structures.

The module asks learners to write their answers on a separate sheet or in a test notebook, not on the module itself.

  • Learners: Take the pretest honestly before reading the lesson. For the performance task, survey and measure an available space. Draw it to scale with paper, pencil, and ruler, then sketch the pond layouts that could fit it.
  • Parents: Help your child find and measure a safe space for the survey activity. Remind them to check the answer key only after finishing each part.
  • Teachers: An answer key is included at the end. Check it against the lesson before using it for grading, since some printed answers do not match the lesson content.

Frequently asked questions

What grade and quarter is this aquaculture module for?

It is Quarter 1, Module 4 of the TLE Aquaculture Exploratory Course for Grades 7 and 8.

What are the types of improved freshwater fishpond layouts?

The module lists four: conventional, radiating, progressive, and specialized. All four use one sluice gate but differ in their canals and secondary gates.

What is the rearing pond?

The rearing pond raises fingerlings up to marketable size. It is the largest compartment in the pond system and is also called the grow-out pond.

How much of the total production area goes to the nursery pond in a conventional brackish water system?

About 1%. The transition pond takes about 9% and the rearing pond about 80% of the total production area.

Does the module have an answer key?

Yes, answer keys for the pretest, activities, and assessment are at the end of the module. Some entries do not match the lesson, so check them against the lesson content.

Full text of the module

The text below is a transcription of the PDF above, as printed.

Technology and Livelihood Education AQUACULTURE Quarter 1 – Module 4: Draw and Layout Ponds (Exploratory Course)

7/8

CO_Q1_ TLE – Aquaculture 7/8_ Module 4

TLE Aquaculture – Grade 7/8 (Exploratory Course) Alternative Delivery Mode Quarter 1 – Module 4: Draw and Layout Ponds First Edition, 2020

Republic Act 8293, section 176 states that: No copyright shall subsist in any work of the Government of the Philippines. However, prior approval of the government agency or office wherein the work is created shall be necessary for exploitation of such work for profit. Such agency or office may, among other things, impose as a condition the payment of royalties.

Borrowed materials (i.e., songs, stories, poems, pictures, photos, brand names, trademarks, etc.) included in this module are owned by their respective copyright holders. Every effort has been exerted to locate and seek permission to use these materials from their respective copyright owners. The publisher and authors do not represent nor claim ownership over them.

Published by the Department of Education Secretary: Leonor Magtolis Briones Undersecretary: Diosdado M. San Antonio

Development Team of the Module

Writers : DESIREE BARETE EMBAJADOR, KATHLEEN JOY P. BARTIANA Editor : PINKY G. TANAP Reviewers : MARIO DONIO, EDWARD RYAN F. GULAM Illustrator : ASCER P. ABELLON JR. Layout Artist : GERALD V. LAUGLAUG, MAYLENE F. GRIGANA, JEFFERSON D. UY Management Team: ALLAN G. FARNAZO, FIEL Y. ALMENDRA, GILDO G. MOSQUEDA, NERISSA A. ALFAFARA, GILBERT B. BARRERA, ARTURO D. TINGSON JR., PETER VAN C. ANG-UG, DONNA S. PANES, MARIO DONIO, JUDITH B. ALBA

Printed in the Philippines by Department of Education – SOCCSKSARGEN Region

Office Address: Regional Center, Brgy. Carpenter Hill, City of Koronadal Telefax: (083) 2288825/ (083) 2281893 E-mail Address: region12@deped.gov.ph

7/8

Technology and Livelihood Education AQUACULTURE

Quarter 1 – Module 4: Draw and Layout Ponds (Exploratory Course)

Introductory Message

This Self-Learning Module (SLM) is prepared so that you, our dear learners, can continue your studies and learn while at home. Activities, questions, directions, exercises, and discussions are carefully stated for you to understand each lesson.

Each SLM is composed of different parts. Each part shall guide you step-by-step as you discover and understand the lesson prepared for you.

Pre-tests are provided to measure your prior knowledge on lessons in each SLM. This will tell you if you need to proceed on completing this module or if you need to ask your facilitator or your teacher’s assistance for better understanding of the lesson. At the end of each module, you need to answer the post-test to self-check your learning. Answer keys are provided for each activity and test. We trust that you will be honest in using these.

In addition to the material in the main text, Notes to the Teacher are also provided to our facilitators and parents for strategies and reminders on how they can best help you on your home-based learning.

Please use this module with care. Do not put unnecessary marks on any part of this SLM. Use a separate sheet of paper in answering the exercises and tests. And read the instructions carefully before performing each task.

If you have any questions in using this SLM or any difficulty in answering the tasks in this module, do not hesitate to consult your teacher or facilitator.

Thank you.

What I Need to Know

This module covers the knowledge, skills and aptitude required in drawing a lay-out plan for ponds.

After going through this module, you are expected to:

  1. identify different ponds compartment;
  2. determine scaling procedures; and
  3. draw lay-out of different pond designs according to established procedures.

What I Know

Choose the letter of the best answer. Write the chosen letter on a separate sheet of paper.

  1. Why are fishpond layouts drawn to scale?
    a. To lessen labor exerted in the construction.
    b. To show the layout in a smaller space.
    c. To show all the compartment units of a fishpond project.
    d. To display the common accessory units of a fishpond.


  2. What type of fishpond layout that has one sluice gate and long water supply canal which supplies the different compartment?
    a. Conventional c. Progressive
    b. Radiating d. Specialize


  3. What fishpond unit is intended for rearing fingerlings to marketable size?
    a. Transition pond c. Rearing pond
    b. Nursery pond d. Brood pond


  4. Which among the fishpond units is used as a water reservoir?
    a. Head pond c. Rearing pond
    b. Catching pond d. Transition pond


  5. Which is intended for the confinement of breeders?
    a. Breeding pond c. Head pond
    b. Rearing pond d. Hatching pond


  6. In brackish water fishpond, where should fingerlings be acclimatized?
    a. Transition pond c. Catching pond
    b. Rearing pond d. Nursery pond


  7. The following are the advantages of pond layout, except.
    a. easy control of pond water
    b. low productivity
    c. artificial feeding can be conducted easily
    d. easy eradication of fish pests and predator.


  8. It consists of one sluice gate, long supply canal and a secondary gates provided to different compartments of progressively increasing number.
    a. Radiating pond c. progressive pond
    b. Conventional pond d. specialized pond


  9. How many percent of the Total production area will be allocated for the nursery pond?
    a. One percent c. 10 percent
    b. 80 percent d. 20 percent


  10. This can be reduced or enlarged by certain amount.
    a. Value c. map
    b. Scale d. pond


Lesson 1: Draw and Layout Ponds

What’s In

Let’s try if you can still remember what you learned about your previous lesson. Choose the letter of the best answer. Write the chosen letter on your test notebook.

  1. The total weight of 30 pcs fish samples is 900g, what is the average body weight of fish?
    A. 30 g C. 50 g
    B. 25 g D. 60 g


  2. How many kilograms are there in 1 ton?
    A. 10,000 kg C. 100 kg
    B. 1,000 kg D. 10 kg


  3. What do you call this preventive measure in which to increase alkalinity of the ponds and improve aquatic organism survival, optimize growth and ensure desirable water quality?
    A. liming C. sampling
    B. feed formulation D. computation


  4. Mixing together various ingredients at the right proportion to produce a nutritionally balanced diet is a process called _____________.
    A. liming C. sampling
    B. feed formulation D. computation


  5. What is the neutralizing value of lime (NVL) for agricultural lime?
    A. 1.73 C. 1
    B. 1.35 D. 1.5


What’s New

One of the growing industries in our locality is aquaculture. Are they successful? If yes, how? Are preparation and construction of ponds essential in their success in farming? Do layouts of the ponds contribute to its success?

The following information will provide you basic knowledge in different layouts of the pond system.

What is It
Fishpond Layout and Design

Fishpond is an artificial body of water surrounded by dikes and with accessories such as gates, pipes and canals to facilitate water supply management.

Fishpond designs must be simple and functional. The style of compartments or units of a fishpond project should be based upon the nature and quality of water supply and the species of fish to be cultivated.

Common Units of a Fishpond

In making a fishpond lay-out, consider the following compartment units and other accessories needed.

  1. Nursery pond (NP) – for the rearing of fish fry to fingerlings size.


  2. Transition pond (TP) – for the storage or acclimatization of fingerlings. It is located adjacent to the nursery pond in order to have an effective and easy transfer of fry. Its pond bottom is constructed a little bit lower than that of the nursery pond.


  3. Rearing pond (RP) – for raising fingerlings up to marketable size. It is the largest compartment in the pond system. It is also a grow-out pond.


  4. Breeding pond – for confining breeders.


  5. Hatching pond – for depositing eggs until these are hatched.


  6. Catching pond (CP) – for confining and catching fry, fingerlings and fish of marketable size. It is constructed at the gate inside the pond where it is intended to be used.


  7. Head pond – for storing reserve water.


  8. Feed pond – for producing food such as lab-lab, lumut or plankton. In fishpond areas where natural foods do not grow well and supplementary feeding is necessary, one of the RP‘s or NP‘s could be utilized as a feed pond. It should be a separate compartment ideally located near the pond where supplementary feeding is intended.


  9. Water supply canal – for supplying water to the different compartments


Scaling Procedure

After knowing the basic units in fishpond lay-out, one must have a knowledge on how to scale the actual measurement of the area to a piece of paper.

A scale is the relationship between the physical object and the feature that represents it on a map. It can be reduced or enlarged by a certain amount.

Examples of a scale are 1:10m, 1:100m, 1:1000m, etc. In the scale, the value of 1 represents the ratio of map (in meter) to the 10m,100m, or 1000m distance in the ground.

Problem 1: If 1 cm on a map represents a distance of 25 km, what is the approximate distance of a length represented by 2.7 cm? We can set up a proportion to show:

1cm = 2.7 cm 25 km x

Solving the equation for x, we get x = 25 (2.7) = 67.5 km.

Types of Improved Freshwater Fishponds Layout
  1. Conventional – consist of one sluice gate and long water supply canal. This supplies the different compartment

[chart: diagram; Fig. 1 Conventional Type (After Denila,1976)] Labels: NP, FP, RP, SC, RP, RP, RP.

Fig. 1 Conventional Type (After Denila,1976)

  1. Radiating – have one sluice gate; wide and short supply canal; and secondary gates in the different compartments.

[chart: diagram; Fig. 2 Radiating Type (After Denila,1976)] Labels: FP, NP, RP, SC, RP, FP, FC [?], RP.

Fig. 2 Radiating Type (After Denila,1976)

  1. Progressive – consist of one sluice gate; long supply canal and a secondary gates provided to different compartments of progressively increasing areas.

[chart: diagram; Fig. 3 Progressive Type (After Denila,1976)] Labels: RP, RP, FP, SC, NP, RP, RP, FP.

Fig. 3 Progressive Type (After Denila,1976)

  1. Specialized – has one sluice gate; one or two drainage gates. Two secondary gates compartment; and a large supply and catching canal/pond.

[chart: diagram; Fig. 4 Specialized type (After Denila,1976)] Labels: FC, NP, RP, RESERVOIR, CP, NP, RP, FC.

Fig. 4 Specialized type (After Denila,1976)

Advantages of the Improved Types of Layout
  1. Easy control of pond water.
  2. Easy eradication of fish pests and predators.
  3. Easy means of cropping.
  4. Pond bottom cultivation can be done when desired.
  5. Artificial feeding can be conducted easily when resorted to after the natural food of fish has been consumed.
  6. High productivity.
Lay-out Specifications for Brackish water Fishpond Systems

A. Conventional Pond System – The NP comprises about 1% of the total production area (TPA). The TP comprises about 9% of the TPA. The RP comprises about 80% of the TPA. The CP intended for a NP and TP must be at least 2% of the compartment‘s watered area and 1 to 1½ if it is intended for the RP.

[chart: diagram; Fig. 5 Conventional (After Alcantara, 1982)] Labels: TP, TP, RP, NP, CP, RP or FP (Feed Pond), RP, RP; Salvage Zone 20 m; Up-stream. Source: http://www.fao.o

Fig. 5 Conventional ( After Alcantara, 1982)

A one hectare lay out of a conventional pond system with the following specifications:

Area = 1,000 m2

NP = 1% of the total production area

TP = 9% of the production area

RP = 80% of the production area

CP = At least 2% of the NP

NP = 10,000 x 1% = 10,000 x 0.01 = 100 m2

RP = 10,000 x 80% = 10,000 x 0.80 = 8,000 m2

CP = 100 x 2% = 100 x 0.02 = 2 m2

B. Modular Pond System. The NP comprises about 4% of the TPA. The TP covers only 6% of the TPA. The RP is divided into three Production Process Sates (PPS). The main idea is to transfer the fingerlings to the next larger module.

[chart: diagram; Fig. 6 Modular Pond System (After Alcantara, 1982)] Labels: TP, TP, NP, NP, NP, PPS1 (1x), PPS2 (2x), PPS3 (4x), PPS1 (1x), PPS2 (3x), PPS3 (9x); River; Salvage Zone 20 meters. Source: http://www.fao.org/3/ac061e/AC061E35.gif

[chart: diagram; Fig. 7 Multiple Stock/ Harvest System (After Alcantara, 1982)] Labels: NP, NP, NP, FHC, FHC, FHC, FHC, RP, RP, RP, RP; Canal; Canal; River; Salvage Zone 20 m. Source: http://www.fao.org/3/ac061e/AC061E36.gif

Fig. 6 Modular Pond System (After Alcantara, 1982) Fig. 7 Multiple Stock/ Harvest System (After Alcantara, 1982)

C. Multiple Stock/Harvest system. There will be at least two (2) NP‘s comprising six percent of the total production area. A fish holding canal (FHC), which holds fingerlings when the rearing ponds are being prepared, covers at least 1% of each RP‘s area. It is connected to the RP in such a way that each RP will have a separate FHC. The RP covers up to 94% of the TPA including FHC. The general practice is to stock at different times, different size, and group of fingerlings and harvests the bigger one‘s selectively with the use of the gill net.

A fishpond system includes a pond water control facility such as dikes, gates and other support structures like water supply canal, drainage canal, flumes, pumps and aerators. These help regulate the flow of the water system.

What’s More

Write down in your test notebook what is being asked in each item.

A. Give at least five common units of a fish pond. B. List all the types of improved freshwater fish ponds layout. C. List all the layout specifications for Brackish Water fish pond system.

What I Have Learned

Answer the following items below using the skills and knowledge that you have learned.

  1. Ponds layout may be grouped into:
    a.
    b.
    c.
    d.


  2. Nursery pond (NP) is used for _____________ the fry to fingerlings.


  3. _________________ is used for supplying water to the different compartments.


  4. Rearing pond also called _________________.


  5. Parts of the water control structure are dikes, _____________ and other ponds support structures such as water canals, drainage canals, flumes, etc.


What I Can Do
  1. Survey an area where you can find an available space to put a possible aquaculture facility. Measure the area. With the use of a paper, pencil and ruler draw the area based on the scaling procedure.


  2. From the given measurement, what possible fish pond layouts can be drawn? Illustrate your answer.


Assessment

I. What Am I? Can you guess what I can be?
  1. I am a compartment. This is where fish fry to fingerlings size can be reared. What am I?
  2. I am an artificial body of water surrounded by dikes, with gates, pipes and canals for water supply management. What am I?
  3. I am a pond lay-out where I have one sluice gate, wide and short supply canal, finally with secondary gates in different compartments. What am I?
  4. I am being reduced or enlarged by a certain amount of numbers. What am I?
  5. I am a freshwater pond lay-out with one sluice gate and long water supply canal. What am I?
II. Identify the following terms. Write your answer on the space provided for.

_________1. A brackish water pond system layout where nursery pond (NP) comprises about 4% of the transition pond area (TPA). The transition pond (TP) covers only 6% of the TPA. _________2. What does FHC stand for? _________3. It is where the eggs are being deposited until they hatch. _________4. A brackish water pond layout where the general practice is to stock at different times, different size, and group of fingerlings and harvest the bigger one‘s selectively with the use of the gill net. _________5. It is used for supplying water to the different compartments.

III. Solve:
  1. A rectangular pond is made using the scale of 1 cm2= 10 m2. If the area of the pond measures 3750 m2, what is the area of the rectangular pond if drawn to scale?
Additional Activities

Label the pond and pond structure.

[illustration: pond and pond structures, with six blank label boxes] Caption: Pond and pond structures

Answer Key

[transcriber’s note: this page is printed upside down; the entries below were read after rotating it, and the answer-key letters and numbers may not be in exact printed order]

What’s I Know
  1. B
  2. A
  3. A
  4. C
  5. A
  6. A
  7. B
  8. C
  9. A
  10. B [?]
What’s In
  1. B A
  2. A B
    A [?]
What’s More

Any five of the following: Nursery pond Transition pond Rearing pond Breeding pond Hatching pond Catching pond Head pond Feed pond Water supply canal

  1. Conventional
  2. Radiating
  3. Progressive
  4. [illegible]
What I Can Do

Answers may vary

What Have I Learned

a. conventional b. radiating c. modular/progression d. multiple stock/harvest pond system 2. rearing 3. water supply canal 4. grow-out pond 5. gates

Assessment
  1. Rearing Pond
  2. Fishpond
  3. Radiating Pond
  4. Scale
  5. Conventional

II.

  1. Modular pond system
  2. Fish Holding canal
  3. Hatching Pond
  4. Multiple stock/Harvest System
  5. Water Supply Canal

III. 375 m2 [?]

References

Cagauan A.G., Tilapia Grow Out Systems and Operation

Calmorin L. P., Calmorin M. A., Tinaypan A. S., Introduction to Fishery Technology REGION 02, Technoguide for Tilapia

Rosel R.N. Tilapia Grow-out in Freshwater Fishpond Sarmiento R.S. Module in Fishpond Engineering and Management

Toledo, C.F. Breeding and Hatchery Management

CBLM, Fish Culture NC II, 3rd Year, Module II. Pages 1-10.

http://www.answers.com/topic/plan

http://fao.org

– Bureau of Learning Resource

For inquiries or feedback, please write or call:

Department of Education – Bureau of Learning Resources (DepEd-BLR)

Ground Floor, Bonifacio Bldg., DepEd Complex Meralco Avenue, Pasig City, Philippines 1600

Telefax: (632) 8634-1072; 8634-1054; 8631-4985

Email Address: blr.lrqad@deped.gov.ph * blr.lrpd@deped.gov.ph

Leave a Reply

Your email address will not be published. Required fields are marked *

For students and teachers

Looking for a school?

Look up the enrollment, teachers, classrooms and facilities of more than 60,000 schools across the Philippines, from DepEd’s public data. Free to use.

Philippine Schools Directory by TeacherPH · every region, province, division and district